Search the Community

Showing results for tags 'layout'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Frontpage, Forum Information and General LEGO Discussion
    • Guest Section - PLEASE READ BEFORE YOU REGISTER!
    • New Member Section - PLEASE READ BEFORE STARTING!
    • Frontpage News
    • Forum Information and Help
    • General LEGO Discussion
  • Themes
    • LEGO Licensed
    • LEGO Star Wars
    • LEGO Historic Themes
    • LEGO Action and Adventure Themes
    • LEGO Pirates
    • LEGO Sci-Fi
    • LEGO Town
    • LEGO Train Tech
    • LEGO Technic, Mindstorms, Model Team and Scale Modeling
    • LEGO Action Figures
    • Special LEGO Themes
  • Special Interests
    • The Military Section
    • Minifig Customisation Workshop
    • Digital LEGO: Tools, Techniques, and Projects
    • Brick Flicks & Comics
    • LEGO Mafia and Role-Play Games
    • LEGO Media and Gaming
  • Eurobricks Community
    • Hello! My name is...
    • LEGO Events and User Groups
    • Buy, Sell, Trade and Finds
    • Community
    • Culture & Multimedia

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


What is favorite LEGO theme? (we need this info to prevent spam)


Which LEGO set did you recently purchase or build?


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests


Country


Special Tags 1


Special Tags 2


Special Tags 3


Special Tags 4


Special Tags 5


Special Tags 6


Country flag

Found 110 results

  1. sander1992

    Imperial Armada Layout

    Hi everyone, Not that long ago I posted my ship on Eurobricks. Now my layout is finished and just in time for Bricks am Meer this weekend. For more pictures visit my Flickr album. Feedback and questions are appreciated. Sander
  2. LegoMathijs

    [MOC] Endarmire Iron Mine

    During the 19th century, steam was the primal and most important source for machinery and vehicles. Besides steam-powered vehicles, mechanics developed clockwork machinery. Interesting and very usefull machinery were the result of the developing. The miners are mining in the Endarmire Iron Mine. They’re searching for iron. The mechanics use the iron to build (mining) machinery. The Endarmire Iron Mine is a large mine, which contains lots of iron and other ores. In the workshop, three mechanics are assembling clockwork drones. The drones going mining for iron. A large mineshaft brings the miners and drones into the mine. The conveyor belt brings the crates, filled with iron, outside the mine. The conveyor belt and mine shaft are motorized. In the center of the layout is a ore-cruncher. There are two docks for flying transport vehicles. Pictures: 01_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr 02_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr 03_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr 06_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr 19_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr 31_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr 18_Endarmire_Iron_Mine by Mathijs Bongers, on Flickr I've took pictures of the individual Steampunk machines, I'll post them soon If you want to see more (detailed) pictures of the layout, see my Flickr album: https://www.flickr.com/photos/mathijslegofan/albums/72157664907370627 I hope you like it
  3. I have a standard 36 inch by 80 inch hollow core interior door on folding legs that serves many purposes in my hobby room. It constantly gets repurposed for any number of different hobbies I enjoy. Currently I have it set up for my trains and I've tried to cram as much track and functionality into it as possible. Right now my layout has: two complete loops, a crossover between the two loops, a reversing leg, five sidings, nine switches, a passenger platform with crossing, a cargo or maintenance terminal and room to park all my trains. My blue cargo train (60052) and white passenger train (60051) can run at the same time despite the zero clearance between the loops. The BNSF loco can navigate the entire layout but cannot pass another train on the curves because of it overhang. I know it might look a little jam packed to some but it provides me with endless switching and running possibilities. Hope you like! Newest update- Here's a video of my layout today with only my custom trains running.
  4. Brickman0707

    New and want to show my layout (WIP)

    Hello I'm new on Eurobricks. I wanted to show my layout of my city. Size 8x 32x32 by 14.5x 32x32 Station wip Beach with bridge and ferris wheel Beach
  5. Hey there, i usually dont post in this forum (being an automobile builder mainly), but i just couldnt help but notice... I do see many layouts where Train Mocs and City sets are assembled together (obviously out of practical reasons). But the thing is, that it seems totally out of scale and relation to each other, not? Now i know some here really take their train scaling to an extreme level of detail and even apply a proper mathematical scale to them (especially 7 to 8 wide fraction). Yet, from my perspective adding City set vehicles or even Speed Champions into the same layout is kinda a bummer when it comes to size relations. It just makes the trains look small After trying out a few train cabs from 6 to 8 wide and comparing them to set vehicles and most 6 wide cars, it simply screams for the automobiles to be smaller in height, length and width. Cause actually most vehicles are oversized compared to the trains - it makes em somewhat "alien" to the whole display - IMO. Having lived through the 9V era, i think that even to this very day any 4 wide automobile will eventually look more true in scale to the layout than any 6 wide ever could. Since the Train widths (offical Lego scale) havent changed, yet their City vehicle scale did, why not go back to the roots a bit more? ;) 4 wides in displays these days are quite rare and tend to look plain, so perhaps something in between? I personally find that 5 wide is a good scale to work upon for standard automobile vehicles, since no matter if 6,7 or 8 wide trains, it simply passes as being in the same "universe" somewhat - just by being "smaller". One might think the detail is getting lost with a smaller automobile scale, but actually, using some of the professional train techniques people use on their Train MOCs, i personally figured that its possible to have the cars "as good looking and detailed" as their counterparts on rails....or at least i believe so^^ Here a supercar example in 5+ wide compared to an offical SC car on a flatbed cargo wagon compared to the "scaling" of the Emerald Express Train Cab. I personally think it blends in better with the allready small 6 wide trains (or 7 wide aswell)...thoughts? Cars and trains - the scale issue. by Ron Dayes, auf Flickr
  6. Hello everyone, in the near future I would like to show you a little bit of my Lego City, which is still under construction. To begin with, here is a video about the beach area I made yesterday. What do you think? Beach Area - Bricksonville Edit: latest video added (17.07.)
  7. Deeks

    Deeks 2017 Winter Village

    Well after taking much inspiration from others here and having moved into a large home this fall I present our family's Winter Village this year! There are far more pictures here http://www.michaeldaykin.ca/2017/12/this-year-as-we-are-in-larger-home-we.html if you are looking for more detail. I had a lot of fun setting up pictures of the crew putting the village together after the move, right from laying the track to the finishing touches. They layout is on a Costco folding plastic table, which by the way are almost exactly 3x7 32 stud baseplates in size. At first I was just laying it out on a white table cloth but after finding white 4x6 plates on the PAB and deciding to try some 3rd party white base plates, I was able to almost completely cover the table with studs. The Village is made up of all of the official Winter sets (less the cottage) as well as a some of the smaller seasonal sets and a couple advent calendars. There are 12 32x32 3rd party baseplates occupying the front 2/3s of the table with the back 1/3 brick and plates. I raised each of the buildings in the back by one brick and used, the 4x6 white plates to texture up to them. The PAB wall also had the round one stud red-trans tiles which I used to mark some paths, and then I went back and they had the red and green 4x4 plates which made the main paths around. My wife also filled in the back of the station a little bit to make the back look more finished. What I really wanted to do this year though was the mountain with Santa's workshop on top. After a BL order I was able to build it to what you see. There is a dish shelf from Ikea providing the structural support. I also used the Creator Mountain Hut to serve as the base of one side of the mountain. The plan for next year is to make it completely brick built and more of an L shape, possibly with a ski hill but definately a second tunnel portal. How it gets fleshed out next year will partially depend on next year's winter set and how it would fit in. I'm going to get one more 4 pack of the base plates I bought so they go all the way to left side of the table and then a couple to go under the back side of the mountain. I hope you enjoy our little village, our family is having a lot of fun with it and setting up little scenes as we go.
  8. McWaffel

    Office Christmas Train

    It's 7 weeks till Christmas week from now and you know what that means? Tis Christmas Train season coming up quickly! Some of you may remember me setting up a little train layout in my office last year. All colleagues loved it very much and so this year me and some colleagues are expanding the office train for this year! Compared to last year the new office train will be about 60% more track, 70% more cars and can carry more than 50% more "real cargo" than last years train! This year's office train will feature the following: - T-Shaped 9V layout with 3 stations (calling at 3 different desks, so everyone in this particular office has access to the train) - 4 Track wide cargo cerminal and card - 20m of track length in total - 16 cars in total - Original Santa Fe Super Chief Engine upgraded with the original light brick - Candy wagon for storing and transporting real eatable candy - Band wagon for transporting a bluetooth speaker and stage for the BrickBand - PF shunting engine for the Power Functions yard - A small handcar (this is an inside joke with colleagues) - Winter Holiday Train which I built yesterday I'm super excited - construction will begin this week. We'll see how far we can build it during lunch breaks. Pictures will follow shortly after! But to get me started, I have a couple of questions: How does one operate a 9V layout with two transformers? Do they plug in parallel (i.e. exactly the same way on both transformers)? What power settings do I use when running a train with two 9V motors (power setting the same on both transformers)? Do I have to unplug one of them if I run a smaller train with only one 9V motor, or do I just not bring up power on one of them? Thanks in advance for answering my questions! Here's the planned layout for this year's office train:
  9. Hello all, A week ago our LUG had a big group layout displayed at LEGOWorld 2017. The layout was a collaboration of @aawsum, @alois, Moos and me. LEGOWorld Utrecht 2017 by Erwin, on Flickr LEGOWorld Utrecht 2017 by Erwin, on Flickr LEGOWorld Utrecht 2017 by Erwin, on Flickr LEGOWorld Utrecht 2017 by Erwin, on Flickr LEGOWorld Utrecht 2017 by Erwin, on Flickr More pictures are available at my Flickr album. PS. mods, is there any way this can be posted in the Train forum too? I don't want to crosspost but I think this concerns both topics equally.
  10. Bricksmith

    [MOC] 'Bricks Cross' - Train Station

    Hi all! I've recently been working on a bunch of train-related projects and figured i'd need a place to display them once a substantial amount have been built. I wanted to do a city center station that, while still small enough to be affordable, gave an impression of being bigger than it actually was. And while it isn't based on the similar-sounding King's Cross, it does deliberately have a very London design. The result is half-terminus, half continuous with the platforms below street level. I tried to render it all as one but my computer doesn't have the processing power for all those bricks! I hope you don't mind seeing the build in its 3 main sections. SECTION 1: The building Ground Floor: First Floor: Front view: SECTION 2: The canopy This will be much longer in the final model. The version rendered here is designed to cover the remainder of the 32 x 32 baseplate. SECTION 3: Base level: Platform & Concourse I hope this has been an interesting looking build to you, I'll update this feed when I finally get around to making it for real!! I'd love to hear any comments and suggestions too! -Isaac
  11. If anyone has been following my forum posts then you know that I don't make my mocs symmetrical because I don't have enough parts too. I make one side how I want to and then either don't make the other side or just very plain. This is extremely frustrating but I've learned to deal with it. I really want to see the size and layout of peoples Lego setups and displays so I can get inspired and maybe others too. Here's what my display and setup looks like: If you haven't noticed, those beads are stored in an ice cube container...that's how desperate I am :)
  12. Hello LEGO fans! I want to share with my new MOC. I tried to make my LEGO railway more realistic. And that's what I did! As you can see, LEGO train tracks looks more interesting with some trees and grass. If you already have LEGO railway, try to add some objects to make it realistic. I like the result! Now my LEGO trains look great on these layouts. Have a nice day!
  13. My Speed Champions layout at the Taupo Hobby Expo 2017 in New Zealand. Contains a Drive In Movie theater, Car Showroom with rotating sign and turntable, Service Center with working pneumatic hoist, Motorbike Shop, Car Wash with moving brushes. Lots of lighting effects. Building roofs were removed for better viewing. More close up photos and videos to come. Enjoy.
  14. Hi all, A new video of my biggest layout so far is online. It has a huge bridge in the middle and has 9 trains running at the same time. Enjoy :)
  15. bnesty

    Wild West layout

    Hello my friends, I would like to intraduce you my Westen layout presented in last exibition of my LUG held couple week ago. Here you can see all my Western MOCs made in past few years together : In this pic you can see these two famous building, never released ideas project "Western modulars". I decided to make partial revival. Saloon is 80% of original, and this white building is apx 70% of orginal.
  16. After many years of dreams, reflections, planning (starting Winter 2011/12), testing (starting fall 2013) and finally building (starting spring 2014), this project has finally crossed the finish line - probably one of the world's most extreme and most challenging layouts for Lego Train 9V! An indescribable feeling, great satisfaction and relief - and what a fantastic experience! First some introductory remarks: This is not a "usual" but rather a conceptual layout with analogue power supply and -management, without landscapes and buildings (except one train station). A particularly sophisticated construction with four themes: a one-track vertical climb, two double-track climbing spirales, a double-track high-level track 2.16 m above floor level and a rail yard. The layout is intended for Lego trains equipped with standard Lego 9V train engines. It is built with standard Lego 9V rails and points, some of which are modified. So are all four 9V Train Speed Regulators. With the help of points, the layout can be segmented into four sections (Loop A - D) which make it possible to run four trains simultaneously, independent of each other, with up to ten engines each. However, this requires more hands... To avoid/prevent spontaneous decoupling, all my trains are equipped with super magnets. I also would like to take this opportunity and thank all of you who have contributed with support, valuable advice, and encouragement during all these years. Without all this help, this project would have remained just a dream. And this is how it looks like: More pictures, facts and videos will be added to the first entry of this thread Addendum # 1: Technical Data and Details: Track lengths: Total track length (incl.sidings and dead-ends): approx. 173 m Total "Tour" length (from start to start): approx. 105 m Loop A (High-level track 1/High-speed track): approx. 32 m Loop B (High-level track 2): approx. 29 m Loop C (Climbing-wall from level 85 to traverse on level 175): approx. 46 m Loop D (Level 50 and level 85): approx. 21 m Rails: 949 straight, 263 curved and 37 modified (4, 8, 10 and 12 straight) Points: 13 standard points (whereof 3 are operated electrically) 6 crossover points (4) 11 half-curve points (1) Track Design Program: Track Designer Application (R) version 2.0 by Matthew D. Bates (Matt's LEGO (R) Train Depot) Electrics/Electronics: 1 Power Supply Unit VOLTCRAFT EP-925, 3-15 V(DC), max. 25A 4 modified Train Speed Regulators (4548) with LM350T regulators, 3A diodes, outside heatsinks (with a thermal resistance of 1.9 K/W), mini-fans and digital thermometers to measure temperatures inside the boxes 4 Control-boxes to operate 12 points electrically. The boxes are equipped with "memory-sticks" to memorize the position of each point since these are out of reach and sight. 12 PF Medium engines mounted on the electrically operated points 52 Power connections to rails 1 Control-box to selectively turn on/turn off 11 power connections Approximately 1000 m cable whereof approx. 850 m RK cable 1.5 square mm Märklin pins and sleeves 1 LED strand (4 m) with dimmer 1 IR-thermometer to measure heatsink temperatures Construction: 7 levels: Rail yard level (50 cm above floor level) Train station level (85) U-curve level 1 (115) U-curve level 2 (145) U-curve level 3 (175) Eaves level (195) Top-level (216) Max. gradient: 83 per thousand (The gradients are built in such a way that all trains can manage to get uphill and downhill with adhesion, i.e. without cogwheels). Min. clearance: approx. 12 cm Train shelves: Shelf system: Algot (IKEA) 15 train shelves type A (102x11x1.6 cm), 8 straight/shelf 27 train shelves type B (166x11x2 cm), 13 straight/shelf 12 train shelves type C (217x11x2 cm), 17 straight/shelf all train shelves are strengthened with 22x45 mm wood strips All in all 54 train shelves with a total length of 86 m (678 straight) and 108 railway buffers 2 "Trains-in-Transit" (TIT) Trolleys (Algot) Room dimensions: 5.5 x 7.3 m Occupied floor space (incl. train shelves): approx. 9 square m Construction materials: Wood (45x45 mm) and wood strips (22x42 mm) MDF boards (6 and 10 mm) Glass shelves (6 mm) Polycarbonate strips (3 mm) and rivets Cable conduits Steel cords (3 mm) with wire locks Perforated plates and angle irons Cable ditches and cabling towards cable terminal Cable terminal Power supply unit and cable terminal box Control center Addendum # 2: More pictures with some of my MOCs Glacier Express with Matterhorn in the background Trans Europ Express (TEE) "Rheingold" and TEE-VT 11.5 in alpine environment Swiss "Crocodile" (10183) with heavy RhB cargo transport in the steepest part of the entire track - a gradient of 83 permille! "Uppsalapendeln" in the midst of the Swiss Alps - imagine if this were for real .... Emerald Night on its way up to the mountains Track Cleaning Train at Knivsta Station - ready for new missions Track Maintenance Train on its way for a new mission Addendum #2A: Train shelves "Trains-in-Transit" (TIT) Trolleys with two Maersk and one TTX Train section(s) ready for transit Addendum #3: Videos https://www.youtube.com/watch?v=47CqLOQKGLM&t=10s
  17. In a previous thread, I proposed a collaborative Nostalgia Train Layout for this Summer's Brickworld Chicago: http://www.eurobricks.com/forum/index.php?/forums/topic/146028-brickworld-2017-train-collaborative/ This is a new thread is to determine participation so this is your chance to sign up :-) We hope that this collaboration will attract many participants by recreating the nostalgic look and feel of the older train layouts featured in Lego catalogs and the train idea book. Unfortunately Brickworld won't permit us enough floorspace to do the large "L E G O" layout I first proposed. Therefor we are moving forward with the alternative shown here: a moderately sized "50" nostalgia layout to celebrate 50 Years of Lego Trains! Here is a description: - The overall size is 16'x13' - Only official Lego sets will be featured: track, trains, stations and other sets. We have limited space so priority will be given to train specific sets first, then to general town sets as needed. Upgrades and part substitutions are fine as long as the trains still look original (for example replacing 12v traction tires, re-gearing an Emerald Night, etc). - This is a floor layout. The green and tan areas are created with colored roll paper taped to the floor. Tracks will be laid down over the colored paper. - Scenery will consist of loose trees, vehicles and figures placed on the paper between the sets (just like in the catalog pictures :-) Open areas will remain so people can step around for access. - Security will be addressed by having special stanchions up all show days (not just the weekend public days). These stanchions will feature a additional lower horizontal pipe to prevent young ones from entering the layout area. There should be about 30" between the stanchions and the outermost tracks. - Once we know what everyone is bringing, we will develop an operating schedule with hours when who's trains will run. The signup sheet is here: https://docs.google.com/spreadsheets/d/1TWLe2n5GGTr_nSR4KT4gXIht13L1dktrYV25H3z30pU/edit?usp=sharing Please list what you can bring and then Please signup by May 15.
  18. What do you think.. are the Speed Champions just a tiny bit too big for a Modular Building Layout, or do they fit in?
  19. One of the first buildings (from our part of the layout) complete for a Medieval layout to be displayed at a LEGO event in Denmark in May (Klodsfest 2017 Aarhus) More buildings can be seen in the video below
  20. Hey Guys, I have been working on a very small set-up that would both allow a number of modulars and some city prices as well as my TRAINS! While I have all the trains powered at this point many will not see any action but I am very happy with how it has turned out and already planning my next modular buy! Lego Train/Town Set Up by Ernie Darby, on Flickr Lego Train/Town Set Up (Left) by Ernie Darby, on Flickr Lego Train/Town Set Up (Right) by Ernie Darby, on Flickr
  21. Freezingvettes99

    Home Layout WIP

    When my wife and I built our new home I decided that I needed my own room for my Lego collection and to build a Lego layout with a complete Lego town. So here are some pictures so far, I hope everyone enjoys what I have done. I used the 9V system exclusively and don't have any plans to change that. It took me forever to ballast the track using the L-Gauge system and a ton of Lego pieces so I really don't plan to change the track layout anytime soon either. The switches are the worst! I am happy with how everything turned out for the most part with the exception ot the yard, I wish it were larger for train staging but such is life. I also wanted a double main but without a 9V crossover solution that isn't possible yet, hopefully sometime soon. Feedback is always appreciated! Lego Layout WIP by freezingvettes99, on Flickr Lego Layout WIP by freezingvettes99, on Flickr Lego Layout WIP by freezingvettes99, on Flickr Lego Layout WIP by freezingvettes99, on Flickr Lego Layout WIP by freezingvettes99, on Flickr Lego Layout WIP by freezingvettes99, on Flickr Lego Layout WIP by freezingvettes99, on Flickr
  22. Hey guys, I've recently been trying hard to come up with a useful layout to use both my old 9V trains and my PF trains on the same layout. I just can't come up with anything that works and is interesting. Most of the time I end up with one loop and a dozen sidings and that would only allow me to run one train at once which is a bit boring. I have a decent amount of track (150+ pieces), both 9V and PF, but I just can't figure out something that I like. Here are a couple examples of some layouts I came up with: I don't really like either of them too much but I can't come up with anything better than these two. I'd like to know how you designed your layouts and how you go about designing new ones. I'd like to utilize as much of the track I have as possible. I've already looked at dozens of pictures online but most layouts are either too big or not interesting enough. Looking forward to seeing yours :)
  23. Hello everyone, for those who do not know me, I'm a big fan of trains and especially Lego Train. I finally have a space to create a Layout finally worthy of the name. My approach comes a little more of the model in the sense that I like to see a train pass over another, to automate the network, make realistic through light signals, station stops, etc. ... I started this project in February 2016 in my basement where I made by myself, furniture and shelf for storing SET Lego but also to design the layout. I was already well advanced when an incident occurred: the flooding of the basement end in May 2016 .... Then in August, the discovery of a leak in the water supply of the house forced me to completely dismantle this first try of a Layout to access the water inlet pipe ..... I come back now in force therefore with a first experience, many tests on the possibility for our pretty trains to climb slopes (straight or curved) to optimize the best of my available space and create a nice layout ! ;-) Due to financial limits, this layout will be not made with 100% of Lego, I will use wood and homemade stickers, custom electronic to make it. Here are the first shots (or I should say the nth plan because with Bluebrick, we never stop to change those plans) to my future Layout (so different from the first that I had designed and unfinished) WMLTL - v5 - Level 0 by LegoLow, sur Flickr Corresponds to trainyard + walkway + a brief passage of the 12V track WMLTL - v5 - Level 1 by LegoLow, sur Flickr Ground level with his future main station WMLTL - v5 - Level 2 by LegoLow, sur Flickr First level of the "mountain" : secondary station and then, possibility to climb in the mountain or to go back to the main level WMLTL - v5 - Level 3 by LegoLow, sur Flickr WMLTL - v5 - Level 4 by LegoLow, sur Flickr WMLTL - v5 - Level 5 by LegoLow, sur Flickr Top of the mountain.... Finally a view (done quickly, I will improving later), global superimposed, giving the idea of what will be hidden, visible .... WMLTL Project - v5 by LegoLow, sur Flickr Following probably next week with the start of the implementation of Level 0. It's a big challenge for me because this project is made of mixing differents things : LEGO, electronics, electricity problematics, Priority management on a network, etc.... Hope you will find that interesting to !
  24. Recently i made some expansions on my Modular Square. Within a few months, i have to fit in the Lego 10255 Assembly Square as well, but i'll find a way! I used 20 modular sets to create this square. For the square itself, i used over 16.000 parts for tiling, trees and benches! Enjoy my HD YouTube video, that i made last week and get inspired!:
  25. Here is my 2016 layout, with most of the items already built, but some still remain to be purchased. Here is a complete list of what's on my tables, not including trains or automobiles because they can be rotated on or off the layout very easily. All of this sits on three very carefully arranged 30 inch by 72 inch tables. Now for the reality check: This is the current state of my trains and town layout. I don't have any other space for things on the table, as below the tables and in the closet is full of Lego bins, either color sorted in slide-out drawers, former model chunks in bins, or put together in customized paper boxes. Here we see the entire layout and compared to the nice chart I posted earlier, it's bit of a mess. The water models area has a police station and Cloud Cuckoo Land in it, and the left hand town area next to the station has my clock radio and assorted stuff for models not yet built. The rail yard is mostly put together, with my streamlined 4-8-2 steamer and diesel PA / PB units getting ready for their day of work. The steam loco is arriving at the coaling / water towers to refuel while the ALCO units are going to be switched onto the mainline to pull it's assigned express train. (The train is not on the table to save space and keep it from getting too dusty.) The town is mostly there, with the streetcars rounding the curves onto and off the main street. The sections only needs two 90 degree (X) crossings to be finished. Now you may be thinking it's really bad, but it is a lot better than it was, and still has a ways to go. It's all about baby steps toward the larger goal of having my dream layout, something I have always wanted since seeing my Dad's layout when I was 5 or 6. For those wondering, here's my ideal layout's items.... most of them I have already, but a half-dozen or so I don't own yet. This layout contains the following track sections: 3 - Right switches 3 - Left switches 62 - Straight segments 46 - Curved segments 2 - 90 degree rail crossing (still needed) 1 - Double rail crossover This layout contains the following train facilities: - Truss bridge - Ironwood Train station -Trolley Stop (still needed) - Water and coal refueling stations - Double stall train shed This layout contains the town buildings: - Sinister Victorian Mansion - Stone Bank - Western Saloon - Thunder's office - Town Hall (still needed) - Military Surplus store - Tudor style House - Model Rocket store - Tavern - Train club meeting house - Railway Headquarters (still needed) This layout contains the following miscellaneous other items: - Tramp steam ship - Lighthouse - Car ferry - Leisure vessel (still needed) - Rural Cabin Comments and feedback would be really appreciated!