efferman

Direct Coupling of Train Wagons

Recommended Posts

because my super chief is a little bit to fast for the corners i have searched a solution to hold it on the rails. and i think a direct coupling of two waggons, or the locomotive with a waggon should be a simple but effective method.

both trailers are using the same pivot point and the same two axles. the pivot point is going till the roof , so the waggons cant lean ot of the corner.

i made a simple testwaggon to test the cornering

101_9291.jpg

101_9293.jpg

101_9294.jpg

i think it works good enough to get a try with a full train

have someone tried this before?

Edited by efferman

Share this post


Link to post
Share on other sites

Yep, I've tried that sort of tapered connection for a tram MOC I was working on. Shared bogie / close coupling techniques are generally quite a practical solution when you want to get rid of the regular coupling for some reason. Good job on that, happy to see it's working for you!

Here's another example for shared bogies I've seen recently, which also claims that the original author of this approach is Jason Allemann with his O-Train, as was my initial understanding.

As you can tell, close coupling works perfectly well for Allemann's O-Train, even though the approach is different, so I can't see why it wouldn't be a safe bet for you as well :) Good luck!

Share this post


Link to post
Share on other sites

because my super chief is a little bit to fast for the corners i have searched a solution to hold it on the rails. and i think a direct coupling of two waggons, or the locomotive with a waggon should be a simple but effective method.

both trailers are using the same pivot point and the same two axles. the pivot point is going till the roof , so the waggons cant lean ot of the corner.

i think it works good enough to get a try with a full train

have someone tried this before?

This is a very long train using a flex method; this image is from "Bricks By The Bay" event in San Francisco, CA, USA:

6992640997_5bd3d6e5b9_z.jpg

BBTB 2012: Trains 3 by Bill Ward's Brickpile, on Flickr

There are more photos of this particular train in the set on Bill's Flickr. I'm not sure if there are instructions or a break-down of parts placement somewhere. I just saw your topic and remembered seeing this -- hope it helps :classic:

Share this post


Link to post
Share on other sites

how i should describe it? the center of gravity is very high on my chief, so the top is leaning out of the corner. when the pivot point is a fixed connection fom the bottom to the roof, the wholöe train is in corners a counterweight. this is hopefully avoiding the leaning ot of the corners and the roll over on full speed.

@LegoMyMamma thanks for the link. it is a nice train and inspiration

Edited by efferman

Share this post


Link to post
Share on other sites

sure i can do it, but there is playing a small kid (not me, iam a big kid) with my trains and this small individiuum thinks a little bit digital. full or nothing.

And at some track combinations this results in high speed railroad accidents :devil:

Share this post


Link to post
Share on other sites

sure i can do it, but there is playing a small kid (not me, iam a big kid) with my trains and this small individiuum thinks a little bit digital. full or nothing.

And at some track combinations this results in high speed railroad accidents :devil:

LEGO trains are designed to crash on the highest speeds because kids like it. I guess you've figured that out though :-) I'm curious if the fixed coupling will work, please let us know the result.

Share this post


Link to post
Share on other sites

it works, but it needs a well balanced axle load to avoid traction problems. my actual version goes with full speed through corners.

101_8304.jpg

101_9307.jpg

101_9311.jpg

a vid will come next days

Share this post


Link to post
Share on other sites

it works, but it needs a well balanced axle load to avoid traction problems. my actual version goes with full speed through corners.

Is that triple powered?

Share this post


Link to post
Share on other sites

I am really keen on seeing the video of the locomotive in action as well as photos of it showing the side profile, I have always been keen on doing a Tri Bo locomotive similar to the RhB Ge 6/6, but I have never bothered to sit down and spend time working out the articulation, if it does work well the LBB might just acquire a similar locomotive :wink: .

2743041939_1a12ca7a0c_z.jpg?zz=1

Edited by Steinkopf

Share this post


Link to post
Share on other sites

Is that triple powered?

curently is only one train motor included. maybe a white japanese train will have more powered axles :wink:

I am really keen on seeing the video of the locomotive in action as well as photos of it showing the side profile, I have always been keen on doing a Tri Bo locomotive similar to the RhB Ge 6/6, but I have never bothered to sit down and spend time working out the articulation, if it does work well the LBB might just acquire a similar locomotive :wink: .

it is a relative simple setup, only to find the correct axle load is a little bit tricky.

here is a little bit action

both trains had the same speed and the vid has no speed up

Share this post


Link to post
Share on other sites

Wouldn't another easy solution be to bank the curves? I regularly place a 1x2 plate on the outside end of sleepers/ties in corners. Keeps the speed up and the train on the track.

Andy

Share this post


Link to post
Share on other sites

Wouldn't another easy solution be to bank the curves? I regularly place a 1x2 plate on the outside end of sleepers/ties in corners. Keeps the speed up and the train on the track.

Andy

it is surely an option, but i like technical solutions.

@ lego train 12 volts

no problem for my chief, it is built solid

Share this post


Link to post
Share on other sites

What is the maximal length between the Jacobs-boogie and normal boogie, if I try to build the first version? (Picture one in the first post)

Is it possible to use this technique with three Jacobs-boogies in a row?

If it works, maybe I'll make a try on my Stadler FLIRT.

Share this post


Link to post
Share on other sites

i hope i understand you correct

between the sections over the bogie and the other sections on my yellow locomotive i have a half stud space between the sections. but the corners of the middle section should be round to avoid a collision.

And i think there is no limit for the count of bogies if the surface under the tracks is flat.

btw. nice train

Share this post


Link to post
Share on other sites
And i think there is no limit for the count of bogies if the surface under the tracks is flat.

Ohh, won't work. Except one exhibition I've never met perfect conditions and flat tracks.

btw. nice train

Thanks, there is a small description in my MOC topic about this creation. Maybe someday I'll find a working and closed solution (not traditional close-coupling) for the couplings between train sections.

Share this post


Link to post
Share on other sites

i have found a solution which allows uneven surfaces under the tracks. now i use a horizontal hinge between wagon and bogie hinge point

101_9314.jpg

101_9316.jpg

101_9313.jpg

101_9312.jpg

101_9317.jpg

the dimensions of the coupling cover is depending of the length and width of the wagons, so everyone must find the best cover for the gap between the wagons if he use different dimensions

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Recently Browsing   0 members

    No registered users viewing this page.