Jump to content

Recommended Posts

Posted

Is there any standards that are applicable to building a modular that connects on 3 sides?

Currently we obviously have the standard modulars that are connected at either end. However has anyone seen a standard spacing for connections on the rear too? My current constructions involve building a train station and railway tunnel... but was wondering if there was a convention for connections at the back as well as the sides.

Posted (edited)

Any images to show us? I'm assuming the rail tunnel is the modular portion with three sides to connect it?

I was designing a modular landscape for my mine sets that would be connected by three or four sides. All I did was just use the existing standard of modular layouts and included it on the third side. This way all the portions will be consistent.

I also designed with Sin awhile back modular sections for an underground railway system. Check out my Flickr account and have a look.

Edited by Wodanis

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...