Jump to content

Recommended Posts

Posted (edited)

Following the build of the 42042 B model crawler tower crane with powered hoist trolley traversing, I decided to build a static free standing tower crane.

Progress to date:-

Base unit with 3 PF motors complete and drives to turntable unit completed.

M motor (1) for slewing the turntable and jib arm / M motor (2) for hoisting / L motor (3) for hoist trolley travel.

Turn table unit: transfer gearbox for two drives (2) & (3) to hoist drum and trolley traverse drums completed

Only one tower unit at present as easier to work on the top sections - when completed more sections will be added to desired height.

During construction the motors are controlled using PF switches to test the drive trains but once completed I will be using the Electric Technic Control unit 2840c02 which can be programmed to operate automatically.

20595095183_6e7bd8fc2b_z.jpgIMG_2510 by Doug Ridgway, on Flickr

21029421679_7d97f500d9_z.jpgIMG_2509 by Doug Ridgway, on Flickr

20593556414_7ffd160642_z.jpgIMG_2508 by Doug Ridgway, on Flickr

21205840392_fe4b6563ab_z.jpgIMG_2512 by Doug Ridgway, on Flickr

21205841702_a1843503d3_z.jpgIMG_2511 by Doug Ridgway, on Flickr

Edited by Doug72
Posted (edited)

No - I started building it several days ago and just noted the crane contest today.

Doug

Edited by Doug72

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...