Update number 3 and the biggest so far, you can keep track on my site as well by
clicking here.
It has been nearly a month since I brought you the last update from my City Project. Since then a lot has changed and the project has progressed really well. In my last post, I brought you images of the Marina set with the extended dockside at the back and the baseplate layout.
Since then the beach section has been re-designed and built. In the original LDD Design the beach had less detail, a different surf shack and the changing rooms were also different. Here is the completed beach section, here you can see the entrance to the beach, along with the female and male changing rooms, the new surf shack, here you can hire surfboards, go wind surfing and more and you can see the beach towels, sand castles and sun shades:
Here is a view of the outside shower and a closer view of the changing rooms, notice the grill for the water to drain away has gone rusty:
The Surf shack has had a redesign since the LDD and has now got loads of extras, such as the surfboards on the side of the shack, inside has a till and life jackets and a few more tools, on the outside you have the boards etc for windsurfing and also a fuel tank to refuel the jet skis that can be hired from the hut as well (these will be added with all the other vehicles) :
The Marina set itself has been update, on the bottom the front has been filled in with double doors, also the whole building has been moved forward 2 studs so the back extension is of equal size. In the shop downstairs, the till area has been doubled with a clear d head with helmet on, you can also buy wet suits in the shop, the rack the housed the life jackets has been moved and is now inside the building, this is due to to me moving the building, had I left it in the original place it would have blocked access. Here is the front image of the bottom of the building:
This is the back of the building:
Here is the downstairs shop from above:
You can now access the cafe via the stairs, inside you can now have cold drinks and pay for you drinks, plus there is seating inside, outside the seating area has doubled in size as well. The roof had to be tweaked so both green slopes fitted, as there was a gap in the roof I added the 2×8 bricks and 2×2 white tiles, here is the stairs:
The outside area:
Inside the cafe:
Here is an overview of progress so far, you can see the foundations for the coastguard building on the left and construction of the boat launch ramp in the middle.
Since My last update, the coastguard HQ building has been designed and has over 3,500 elements to it but I won’t reveal it till it is built. Also the original stages I listed in Update 1 back in April has changed, below is a plan of action, along with the dates completed:
Stage 1: Build the LEGO City Marina (set 4644) – Completed 28/3/12.
Stage 2: Concept design on LDD - Completed 8/4/12.
Stage 3: Construct the Baseplate layout – Completed 6/5/12.
Stage 4: Build the extended dockside of the marina – Completed 6/5/12.
Stage 5: Add the beach, surf shack, changing rooms – Completed 3/6/12.
Stage 6: Add the extension to the shop and cafe and add the stairs – Completed 3/6/12.
Stage 7: Add the boat launch ramp and security gates.
Stage 8: Add the security building and trees.
Stage 9: Add the foundations to the coastguard HQ.
Stage 10: Construct first floor section A of the coastguard HQ.
Stage 11: Construct first floor section B of the coastguard HQ.
Stage 12: Construct second floor section A of the coastguard HQ.
Stage 13: Construct second floor section B of the coastguard HQ.
Stage 14: Add the roof to the coastguard HQ.
After that is all done, I still have to decide a plan of action for the minifigures, vehicles and pavement area. In my next update I aim to have stage 7 and and 8 completed and more progress made on stage 9. I should also be in a better position my my places for the finishing touches. For more images of the progress so far