Sign in to follow this  
system

[M - B09] Energy manipulation experiment

Recommended Posts

Planet: B09

Tags: spaceship, science

Huge science space ship with was sent behind enemy frontline to perform important experiment of combining multiple remote energy sources.

Crew size: 51.

Military personnel: 6.

Total weight: 10.000 tons

Emitter max output 30MW/s.

Advance positioning system accuracy: 6mm/100km

Defense: not installed.

Spaceship bridge log entry: 30151215

Long Range Energy Transfer (LRET) experiment.

Time 14:35

23779237876_fd8ecf8d20.jpg

Story and more pics below:

Pilot: on the orbit.

23805335515_059ba7592d.jpg

CMO (Chief Mission Officer): Preparing systems and aligning ship.

Operator: All system ready.

23722896711_2bea93decb.jpg

s-555: on position:

23805346865_4c88701ebb.jpg

s-555: Waiting for long distance transfer

23178550663_3582ca33e8.jpg

Operator: incoming transmission.

s-058: Energy impulse detected. Expected to reach destination in 2 minutes 23 seconds.

CMO: Starting countdown 2 minutes 10 seconds. Go.

Operator: Countdown started.

Operator: Reactor check?

Reactor crew: Reactor 30%, go.

Operator: Power grid?

Reactor crew: Power grid are go.

Operator: s-555 status?

s-555: in position, and ready.

Operator: s-560 status?

s-560: communications are go.

Operator: APS?

APS crew: APS aligned, go.

Operator: Debris monitoring?

s-560: Debris monitoring are go.

CMO: All sections, activate magnetic correctors.

23779244416_fbcce5373e.jpg

Operator: Section 1 status?

Crew member: Section 1 are go.

Operator: Section 2 status?

Crew member: Section 2 are go.

Operator: Section 3 status?

Crew member: Section 3 are go.

Operator: Section 4 status?

Crew member: Section 4 are go.

Operator: Energy output to 60%

Reactor crew: energy set to 60%.

Operator: 24 seconds and counting.

23437391339_c0e6f704d2.jpg

Operator: 15 seconds. CMA status?

CMO: LRET go.

23509655320_7b292938c1.jpg

Operator: 8, 7, 6, 5, 4, 3, 2

Operator: Activate energy transfer, now.

23696915082_6e3146c674.jpg

s-555: channel 1 established. Receiving 12MW/s Expecting channel 2 is 4 seconds.

23805479495_57bd2238e5.jpg

s-555: Channel 2 established with 34MW/s. Combining energy sources. Done. Activating Pulse Impact Drill.

23779814046_aaa12502a9.jpg

s-555: Channel 2 closed.

23805351205_685e539bf2.jpg

CMO: stop LRET in 3,2,1 Stop now.

Operator: LRET off.

CMO: s-555 status

s-555: all systems are ok.

CMO: Hibernate all LRET systems.

Report to HQ that mission was successful.

yCMO: good job everyone!

Share this post


Link to post
Share on other sites

Nice mini-builds! Since it was sent behind enemy lines, it kinda needs its defense installed pretty soon!

Indeed! and well officially these are just corporations and not military organisations...

That's not to say corporations don't have private armies fighting secret wars of course.

Share this post


Link to post
Share on other sites

Indeed! and well officially these are just corporations and not military organisations...

That's not to say corporations don't have private armies fighting secret wars of course.

allegedly.....but who knows?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

  • Recently Browsing   0 members

    No registered users viewing this page.